This was an ambitious project that spanned more than 7,880m² on three levels including ramps over two buildings. We installed the Sika Carpark Deck System to 4,570m² on the top level of the two buildings over three phases of work, and Sikafloor® MultiDur EB-14system System to the on levels zero and one.
We also installed approximately 2,700m² of green pedestrian walkways in the Sikafloor® MultiDur EB-14 system.
We worked closely with Macrennies and Sika NZ to overcome the unique technical design challenges presented during the installation, the huge environmental problems from high winds, heat, humidity and rain (sometimes all at once) in an Auckland climate, and the logistical issues of moving and installing up to 30 tonnes of materials in a single day.
Having partners like Sika and Macrennies are key to delivering projects like this and we were very happy to have them on our team.