A luxury lodge was having problems with an existing ceramic tiled floor in the main kitchen.
We removed all of the tiles and tile bed and prepared the concrete substrate. We reinstated the falls to floor drains at 1:100 gradient using 5.5m3 of Allnex STZ Prefill.
We completed the installation using Allnex Sureshield floor topping, coved to all upstands with a slip resistant finish in Natural Gold colour.